Welding Production & Cost Estimator

Turn wire size and feed speed into a deposition rate, then into arc time, shop labor hours, and a total job cost, factoring in operating factor and consumable pricing.

⚠ Disclaimer: Use at Your Own Risk This tool is provided "as is," for general engineering reference and educational purposes only, with no warranty of any kind. Deposition rate is calculated from wire geometry and density, not a fixed industry constant, so results will vary slightly from single-number rules of thumb. Operating factor, labor rate, and consumable pricing are shop-specific inputs you must supply; the suggested operating factors are broad industry ranges, not a substitute for your own production data. Jeffrium and Jeffrey Sowards assume no liability for decisions, budgets, bids, or outcomes based on this tool's output. Use of this tool is entirely at your own risk.
Wire & Deposition
Job & Labor

Operating factor is arc-on time as a share of total shop time; the rest is fit-up, positioning, slag/spatter removal, and changeover.

Deposition Rate

DR = (π/4)·d²·WFS·60·ρ·η
-

Time & Cost

How it works

How deposition rate and welding cost are calculated

Labor is usually the largest welding cost. This estimator works forward from what the wire feeder delivers to arc time, shop time, and total job cost.

The math

DepositionDR = (π/4) · d² · WFS · 60 · ρ · η
Arc timeW / DR
Shop timearc time / OF
Laborshop time × hourly rate
Wire(W / η) × price per lb
d, WFSwire diameter, feed speed
ρ, ηdensity, deposition efficiency
Wweld metal weight
OFoperating factor

Worked example

Given0.045 in steel wire at 350 in/min, 5 lb of weld, 40% OF, $65/hr labor, $4.50/lb wire
DepositionDR = 9.01 lb/hr
Arc time5 / 9.01 = 0.55 hr
Shop time0.55 / 0.40 = 1.39 hr
Labor + wire$90.17 + $23.68
Result$113.85

Labor is about 80% of the cost, so operating factor is usually the first thing to improve.

More detail

Why not use the 13.1 × d² × WFS rule?

The shop rule DR ≈ 13.1 × d² × WFS is the same equation with a steel density and 100% efficiency built in. It doesn't hold for aluminum, nickel, or titanium wire, or in metric units. Calculating from geometry and density works for any wire.

Typical operating factors
SetupArc-on time
Manual (SMAW, GTAW)~25%
Semi-automatic (GMAW, FCAW)~40%
Mechanized or robotic65%+

The rest of the shift goes to fit-up, positioning, tacking, cleaning, and changeovers. Better fixturing usually saves more than a faster wire feed speed.

References
  • Lincoln Electric, The Procedure Handbook of Arc Welding, 14th ed.
  • AWS, Welding Handbook, Vol. 1, Welding Science and Technology.

Need a full program-level estimate?

Multi-pass procedures, mixed processes, and crew-level scheduling are exactly the kind of estimating work Jeffrium takes on directly.

Discuss a custom tool